In a PV system, solar cables are designed to transfer energy from the solar modules to the inverter. If their functionality is negatively affected by incorrect installation, this will directly impact the PV system's performance. In the worst case, the system may have to be shut down.
There are other reasons why correct installation of solar cables is important:
Only with correctly installed solar cables will the PV system comply with applicable regulations (e.g., DIN VDE 0100, IEC 60364) and be successfully accepted at the end of installation. This is crucial for obtaining full insurance coverage.
Tip: KBE solar cables are triple-certified according to the European standard EN 50618 (H1Z2Z2-K), the international solar cable standard IEC 62930 (IEC 131), and the standard 2Pfg 1169 /10.2019 (PV 1500-K).
A clean, well-thought-out installation facilitates subsequent inspections and repairs, saving time and money.

KBE offers solar cables in different lengths:
| KBE Solar DB+ | KBE Solar DB+ AR-TR | KBE Solar Floating | KBE Solar DB VDE | |
|---|---|---|---|---|
| 100 m coil | ✅ | ❌ | ✅ | ❌ |
| 500 m Drum packaging | ✅ | ✅ | ✅ | ✅ |
| 1000 m Drum packaging | ✅ | ✅ | ✅ | ✅ |
Related standard: EN 62548
“Cables must be installed in such a way that wind or snow do not cause permanent damage.”
Reason: The swinging of a cable coil can lead to abrasion at the support point.
Solar cables in PV systems must meet the requirements of EN 50618.
The materials used for these cables are selected to withstand ambient temperature fluctuations from -40 °C to 90 °C and to be resistant to UV radiation.
The expected service life is 25 years.

As a general rule, solar cables should always be laid separately from other circuits.
If wires and cables from different circuits are to be laid together in conduits or cable ducts, you must observe EN 62548 (Section 7) or DIN VDE 0100-520.
DIN VDE 0100-520: "Multiple circuits are permitted in one conduit or in one openable conduit if all conductors are insulated for the highest nominal voltage occurring and the conduits or openable conduits have sufficient cross-sections."
| 4 mm² | 6 mm² | 10 mm² | |
|---|---|---|---|
| freely movable | 22 mm | 24 mm | 29 mm |
| permanently installed | 17 mm | 18 mm | 22 mm |
| mechanically stressed | 33 mm | 36 mm | 43 mm |
| 4 mm² | 6 mm² | 10 mm² | |
|---|---|---|---|
| horizontal | 250 mm | 250 mm | 250 mm |
| vertical | 400 mm | 400 mm | 400 mm |

Related standard: DIN VDE 0100-712, section 712.521.101
Related standards:
DIN VDE 0100-712, Section 712.521.102:
"To minimize voltages induced by lightning, the area of all cable and conductor loops should be kept as small as possible, especially in the cabling of PV strings."
EN 62548, Paragraph 6.6.2:
"Solar cables and the equipotential bonding conductors must be laid as parallel as possible."
Related standards:
DIN VDE 50174-1 Section 5.2.4 and DIN VDE 0891 Part 6 Section 4.2:
"Installation on a solid, smooth, and stone-free trench bottom and bedding in sand or stone-free soil."
You are currently viewing a placeholder content from Facebook. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More InformationYou need to load content from hCaptcha to submit the form. Please note that doing so will share data with third-party providers.
More InformationYou need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.
More InformationYou need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.
More InformationYou need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.
More InformationYou need to load content from Turnstile to submit the form. Please note that doing so will share data with third-party providers.
More InformationYou are currently viewing a placeholder content from Instagram. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More InformationYou are currently viewing a placeholder content from X. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More Information